Location
Revithoussa Island, Greece
Assigner
TERNA S.A.
Services & Industries
Industrial Insulation, Power Stations, LNG
The project involves installing cryogenic insulation for pipe networks connecting existing lines to the LNG road tanker filling station on Revithoussa Island. The purpose of the insulation is to protect the pipes from the extremely low temperatures associated with LNG transport, ensuring the system operates efficiently and safely.