Location
Revithoussa Island, Greece
Assigner
TERNA S.A.
Services & Industries
Industrial Insulation, Power Stations, LNG
The project includes the pre-measurement and upgrade of two high-pressure pumps, along with the necessary piping and the new Open Rack Vaporizer (ORV) system. The work is accompanied by the application of cryogenic insulation, ensuring the safe and efficient operation of the equipment at extremely low temperatures, thereby enhancing the overall performance and reliability of the system.